CASE STUDY

GREENWICH S.P.S. GREENWICH, LONDON

CLIENT

Thames Water

ODOUR SOURCES

Penstock Building located less than 20 metres from Apartment Block.

 

DESIGN VENTILATION RATE

1,080m³/Hr.

 

DESIGN INLET ODOUR LOADINGS

AVERAGE PEAK
Hydrogen Sulphide 5ppm 10ppm
T.O.N. 30,000 OUΕ/m³ 100,000 OUE/m³

ODOUR CONTROL SYSTEM DESIGN

2 No. P1000 Peacemaker Dry Chemical
Filter-Scrubber Modules connected in parallel, incorporating AWT Triox and Diox Media.

PERFORMANCE GUARANTEE REQUIREMENTS

<0.1ppm H2S and 500 OUE/m³

PERFORMANCE ACHIEVED

<100 OUE/m³

MEDIA LIFE DESIGN GUARANTEE

Minimum 4 Years

 

Leading Specialists in the Field of Air Pollution & Odour Abatement